One owner, one timeline, in two languages

Every case at Wizea has one owner, who works with you in English and with the factory in Mandarin, on a written timeline. The process is written down before the order, in our Terms of sale, so both sides know each step in advance.

At pre-shipment inspection in Shenzhen

StepWhat happensCost allocation
HoldThe lot stays in Shenzhen until the finding is resolved; the balance is linked to the inspection result.—
DocumentFindings photographed and measured against the sealed sample and the written tolerance list; sample size and acceptance criteria stated—
ClassifyCritical, major, minor, under the criteria agreed at order—
DecideRework, sorting, partial acceptance or replacement, agreed in writing with the factoryRework and sorting for findings against approved criteria are for the factory's account; a change in your requirement after approval is for yours
Re-inspectThe reworked or replacement lot is inspected again before consolidationFactory
RecordCorrective action requested and verified before the factory receives new orders—

Inspection in Shenzhen means findings are resolved close to the factory, before consolidation and before the balance is due.

After delivery

StepWhat happensWhen
Case openedYour report, with photographs, quantities, lot and date codes, is registered; you receive a case reference and the name of the ownerSame business day
ContainmentAffected stock held on both sides; if your production needs it, alternative sourcing starts in parallelStarts at case opening
Root causeInvestigation with the factory in its language; laboratory analysis where needed; findings in writingTarget date agreed at case opening
Corrective actionReplacement, rework, credit or refund under the Terms of sale; corrective action verifiedAs agreed

A good case file makes each step faster: photographs with scale, quantities, carton numbers, date and lot codes and your incoming-inspection record. We ask for the same evidence from the factory, so root cause and corrective action rest on facts.

Schedule follow-up

The production schedule is on the order confirmation, and you receive status updates at agreed milestones. Holiday windows, such as Chinese New Year, are flagged inside the lead time on the quotation. Any deviation from the schedule is reported as soon as it is identified, together with the options: partial shipment, air freight of a first quantity at an agreed cost allocation, or a second source already qualified in the same category.

Tooling ownership

Tooling ownership is stated on the order before production starts. Our default for custom parts: tooling paid for by the buyer belongs to the buyer, is held at the factory for the programme, is listed in a tooling register with photographs and identification, and is released or transferred on written instruction. Tooling amortised in the piece price belongs to whoever the order names.

Scope, stated precisely

  • Inspection depth is planned from the part and its history, so findings surface before dispatch and before the balance is due.
  • Customs classification, duties and clearance in the destination country are handled by the importer and the broker, with our documents and support.
  • The counterparty for every case is Wizea Technology Limited, Hong Kong, under Hong Kong law with HKIAC arbitration.
FAQ

Short answers on this topic

What happens when a lot does not pass pre-shipment inspection?

The lot stays in Shenzhen; findings are documented against the agreed criteria and classified; rework, sorting or replacement is agreed with the factory; the result is re-inspected before consolidation; corrective action is recorded.

Who pays for rework?

Rework and sorting for findings against approved criteria are for the factory's account. A change in the buyer's requirement after approval is for the buyer's. The order states it.

How do I open a case after delivery?

Send photographs, quantities and lot codes. You receive a case reference and a named owner the same business day; containment starts at case opening; root cause and corrective action follow on agreed dates, with replacement, rework, credit or refund under the Terms of sale.

How am I kept informed about the production schedule?

Through the production schedule on the order confirmation, status updates at agreed milestones, and holiday windows flagged inside the quoted lead time.

Who owns the tooling?

What the order says. By default with Wizea, tooling paid for by you is yours, held at the factory for your programme and listed in a tooling register you can request.

Tell us what you buy, and how often

A drawing, a BOM or one hard-to-find line, in any format. Add annual quantity and delivery rhythm, and we propose the programme.